Single series machine
After the two parties sign the contract, the technical department will make a general drawing of the ordered equipment for the customer in the shortest possible time for the customer to confirm. If any improvement is needed, we will revise the drawing until both parties confirm the most reasonable design.
Food production line or feed project
After the preliminary plan is basically determined, our cost engineers will conduct a preliminary project costing for the user to confirm. Both parties can adjust the project according to the budget, and make appropriate changes to the production process or configuration while ensuring the functionality of the system. At the same time, in order to meet the needs of different materials, Shandong Arrow Group has a professional formula laboratory, you can choose the production machine according to the experimental data.After the preliminary plan and price are basically determined, if necessary send the project team to visit and negotiate on site, both sides will finalize the plan and price.